$400 set-up includes 150' of hose with a capability to pump 400'. $10 per cubic yard pumped, $1 per foot after 150' Overtime after 3 hours is 90/hr. Off site washouts at request is $50
*Offsite washouts are sometimes requested when there is not a dedicated washout pit.
Big Rock Prevailing Wage- $305/hour flat rate All pumping will also have a 3% fuel surcharge
$275 set-up include 200' of system with a 450' capability. $7/ cubic yard pumped and $1/ ft after 200'. Overtime after 3/hours is 75/hr.
Pea Gravel Prevailing Wage- 230/hour flat rate
All pumping will also have a 3% fuel surcharge
Demolition cutting is 125/hour with a 2 hour minimum, prevailing wages is 150/hour with a 4 hour minimum. If cutting over 200' a laborer will be sent at $25/private and $85/prevailing 10% slurry fee
Green Cutting $150 setup includes 50' of cutting, 80 cents/ft there after up to 2.5" thick cut
Coring- 125/hr with a 2 hour min. If core catcher is required rate is 150/hour