$400 set-up includes 150' of hose with a capability to pump 400'. $10 per cubic yard pumped, $1 per foot after 100' Overtime after 3 hours is 100/hr. Off site washouts at request is $50
*Offsite washouts are sometimes requested when there is not a dedicated washout pit.
Big Rock Prevailing Wage- $305/hour flat rate All pumping will also have a 3% fuel surcharge
$300 set-up include 150' of system with a 450' capability. $7/ cubic yard pumped and $1/ ft after 150'. Overtime after 3/hours is 75/hr.
Pea Gravel Prevailing Wage- 230/hour flat rate
All pumping will also have a 3% fuel surcharge
Demolition cutting is 135/hour with a 3 hour minimum, prevailing wages is 150/hour with a 4 hour minimum. If cutting over 200' a laborer will be sent at $35/private and $95/prevailing 10% slurry fee
Green Cutting $150 setup includes 50' of cutting, 80 cents/ft there after up to 2.5" thick cut
Coring- 135/hr with a 2 hour min. If core catcher is required rate is 170/hour, up to 6" hole if a bigger core is required add $5/hr
Wall Saw- 2 men required $210/hr with 3 hr min. 10% slurry and blade add
Copyright © 2024 Titan Construction Services Inc. - All Rights Reserved.
Powered by GoDaddy Website Builder